CSRBOX

RFP invites for Plantation work at KIOM Phase-III (ML. No. 1111) for Afforestation of 15000 Saplings for the year 2019 as per R&R plan including maintenance of saplings

RFP invites for Plantation work at KIOM Phase-III (ML. No. 1111) for Afforestation of 15000 Saplings for the year 2019 as per R&R plan including maintenance of saplings

Organization: NMDC Limited

Apply By: 04 Jan 2019

RFP title: RFP invites for Plantation work at KIOM Phase-III (ML. No. 1111) for Afforestation of 15000 Saplings for the year 2019 as per R&R plan including maintenance of saplings

Deadline: 4th January 2019

Name of Work: "Plantation work at KIOM Phase-III (ML. No. 1111) for Afforestation of 15000 Saplings for the year 2019 as per R&R plan including maintenance of saplings for a period of 3 years after completion of planting period"

Tenders are invited for the work of "Plantation work at KIOM Phase-III (ML. No. 1111) Afforestation with 15000 Saplings for the year 2019-20 (As per R&R plan) including maintenance of saplings for a period of 3 years after completion of planting period"

The complete bid document can be viewed and /or downloaded from NMDC LTD.’s website http://www.nmdc.co.in  and Central Public Procurement Portal (CPP) http:/? www.eprocure.gov.in . from 05.12.2018 to 04.01.2019.

About:

NMDC Limited is a profit making Govt. of India Enterprise under Ministry of Steel engaged in the mining activities of exploration and exploitation of various minerals. 02 NMDC invites sealed bids “on Item Rate Basis” from eligible Indian contractors. Open Tenders in two bid system (a) Part-I consisting of EMD, Letter of Undertaking, Cost of tender document if downloaded from website, pre-qualification & techno- commercial bid (b) Part-II Price bid are invited from experienced and qualified contractors for the work of of "Plantation work at KIOM Phase-III (ML. No. 1111) Afforestation with 15000 Sapling for the year 2019-20 (As per R&R plan) including maintenance of saplings for a period of 3 years after completion of planting period" Donimalai Dist. Ballari, Karnataka”

Pre Qualification Criteria:

The average annual financial turnover during the last three years, ending 31st March of the previous financial year should be at least Rs. 17.11 Lakhs

Experience of having successfully completed Similar Works during last Seven (7) years ending last day of month previous to the date of notification in the NEWS paper, should be either of the following:

One Similar Completed work costing not less than Rs. 28.51 Lakhs Two Similar Completed works each costing not less than Rs. 17.11 Lakhs

OR

 Three Similar Completed works each costing not less than Rs. 11.41 Lakhs

Scope of Work:

The scope of work is generally defined but not limited to what has been given below.

In general, the scope of work shall include, but not limited to the following –

  • Selection of Quality Plants as per requirement.
  • Making of Stack for measurement of Good Earth, Manure and Sand as per work Order.
  • Specified Pits for plantation as per the Work Order.
  • Transportation in the field as per the requirement.

The contractor shall provide all necessary materials, equipments, labour, tools and tackles and other incidental items required for the execution and maintenance of the work. All materials shall be got approved by the OWNER prior to procurement and/or use. The Contractor will submit to OWNER the inspection certificate after inspection and passing of materials by the OWNER before bringing the same at site for use.

The EMD will be forfeited if,

The EMD shall be refunded / forfeited as per the provisions given in tender documents. However, the principle factors in this regard to be followed are as under:

The EMD will be forfeited if,

  • The Tenderer modifies or withdraws his offer after due date and time of submission of the bids.
  • The tenderer resiles from his offer during the validity period.
  • The tender is revoked during its validity period by the tenderer.
  • The validity of the BG is not extended / not kept valid for a specified period of three (3) * months beyond the extended validity of the offer.
  • The tenderer increases the prices unilaterally after the opening of tender and during the validity period of the tender

Manner Of Submission Of Tender

All the tenders shall be prepared by typing or printing with indelible black ink/blue ink on white paper in sequentially numbered pages and be in solid binding. Each tenderer shall submit his proposal two copies (one in original and one copy)

The tenderer's tender and the documents attached thereto shall be considered for forming part of the contract documents. In case of discrepancy between original and copy, original shall prevail.

For more information please check the Link

 
https://csrbox.org/
 

https://shorturl.at/swzPT
 

© Renalysis Consultants Pvt Ltd