CSRBOX

EOI for Selection and Engagement of Consultant for Environmental Clearance from State Environmental lmpact Assessment Authority (SEIAA) under Ministry of Environment.

EOI for Selection and Engagement of Consultant for Environmental Clearance from State Environmental lmpact Assessment Authority (SEIAA) under Ministry of Environment.

Organization: Maharashtra Metro Rail Corporation

Apply By: 17 Jun 2019

EOI title: EOI for Selection and Engagement of Consultant for Environmental Clearance from State Environmental lmpact Assessment Authority (SEIAA) under Ministry of Environment.

Deadline: 17th June 2019

Maharashtra Metro Rail Corporation is a Special Purpose Vehicle (SPV) responsible for implementing Nagpur Metro Rail Project which includes construction of Viaduct, Stations and other structures for operational requirements. Environmental Clearance (EC) from Ministry of Environment, Forest and Climate Change (MoEFCC) is exempted to Nagpur Metro Rail Project as per EIA Notification, 2006. Though Metro Rail projects are not required to seek EC under EIA Notification, however various property developments and/other developments planned by Maha-Metro along or off the corridor requires prior environmental clearance as per EIA notification ,2006.

As per EIA notification, 2006 the projects having built-up area equal to or more than 20,000 square meter up to 1,50,000 Sq.mt comes under project/activity 8 (a) for Category-B projects which requires Environmental Clearance (EC) from State Environmental lmpact Assessment Authority (SEIAA). Mentioned below are other statutory requirements applicable to PD(Property Development) area in reference to EC from SEIAA.

  • Built-up area more than 20,000 square meter up to L, 50,000 Sq.mt which requires EC from Maharashtra State Environmental lmpact Assessment Authority (SEIAA).
  • "Only accredited consultant from National Accreditation Board of Education and Training (NABET) is allowed to appear before the State Level Expert Appraisal Committee". (As per Office Memorandum of MoEF & CC, GOI dated 3oth September 20Lt)
  • To obtain the EC from SEIAA, Maha- Metro Invites Expression of Interest (EOl) to shortlist and engage the reputed Agencies for Property Development Projects. On the basis of technical evaluation, financial bid will be invited from the shortlisted technically qualified agencies.

EOI Evaluation:

Stage-1; Includes mandatory requirement and additional requirement as per Annexure l, ll & lll

Stage-l: Basic Requirement shall be mandatory requirement and Additional Requirement to the consultants. On the first stage, the technical proposal will be evaluated. Only those applicants whose technical proposal scores minimum 60 Marks out of 100 Marks shall be considered and the first 5 (Five) consultants who qualify the maximum points as per mandatory and additional requirement shall be considered and called for the Financial offer (stage-ll).

For more information please check the Link

 
https://bit.ly/2Kh0tvX
 

https://indiacsrsummit.in/index.php?p=home
 

http://www.techforimpact.net/
 

https://www.indiacsrsummit.in/
 

© Renalysis Consultants Pvt Ltd