CSRBOX

RFP for Construction of Girl’s Toilets in government schools in Chachoda & Raghogarh blocks in Aspirational District - Guna under CSR Scheme of NFL

RFP for Construction of Girl’s Toilets in government schools in Chachoda & Raghogarh blocks in Aspirational District - Guna under CSR Scheme of NFL

Organization: National Fertilizers Limited

Apply By: 27 May 2019

RFP title: RFP for Construction of Girl’s Toilets in government schools in Chachoda & Raghogarh blocks in Aspirational District - Guna under CSR Scheme of NFL

Deadline: 27th May 2019

Name of work: Construction of Girl’s Toilets in government schools in Chachoda & Raghogarh blocks in Aspirational District - Guna under CSR Scheme of NFL.

Specifications:

 The specification for workmanship shall be as described in the Central Public Works Department latest "Specifications" including amendments, unless otherwise specified. These CPWD specifications shall be deemed to form part of this contract.

The CPWD specifications shall take precedence over the provisions in the BIS specifications.  Wherever CPWD specifications are silent, the relevant BIS specification shall be referred.

In case of any class of work for which there is no such specification as laid down in the contract, such work shall be carried out in accordance with the instructions and requirement of the Engineer in charge.

Scope of Supply of Materials/Machinary By Nfl:

NFL will not issue any material from its store for executing this contract; all materials required for execution of the work shall be arranged by the contractor from market at his own cost.

All tools and plants required for execution of the work shall be arranged by the contractor from market at his own cost.

Watch and ward of the work and materials brought to site for execution of the work shall be arranged by the contractor with his own cost.

Scope of Supply of Materials By Contractor:

All the materials / tools and tackles, staging / scaffolding required to execute and complete the work in all respects shall be arranged by the contractor at his cost from the open market.

All white vitreous China water closets to be used in the work shall be of 1st class quality of the approved manufacturer.

Others:

No compensation for any damage done to the executed job or to the raw materials stored at site, by rain, flood, or any other unavoidable circumstances, or natural calamities during the execution of work or up to expiry of liability period, shall be made by NFL.

For more information please check the link

 
https://bit.ly/2YB4TSU
 